How do you calculate the cost of an injection moulded part?
Part cost is the material per part, plus machine time per part, plus tooling spread over the quantity, plus labour, inspection, finishing, packing and freight, adjusted for scrap. Machine time per part is the machine hour rate multiplied by cycle time and divided by the number of cavities.
To calculate the cost of an injection moulded part, spread the one-off mould cost across the planned quantity, add the per-part material, machine time, labour, inspection, finishing, packing and freight costs, and adjust for scrap. In general manufacturing terms, unit cost equals fixed cost divided by the number of parts, plus variable cost. The mould is the fixed cost, while material and machine time are variable costs paid on every part.
What is the formula for the cost of an injection moulded part?
Part cost equals tooling per part, plus material per part, plus processing per part, all divided by the fraction of parts that pass inspection. Material dominates the cost of commodity parts, while tooling can dominate custom parts made in low quantities.
| Component | How it is calculated | What moves it |
|---|---|---|
| Tooling per part | Mould cost and maintenance, divided by total parts made | Quantity, mould complexity, steel |
| Material per part | Part weight plus runner and scrap share, times the resin price per kilogram | Part size, resin grade, runner type |
| Machine time per part | Machine hourly rate times cycle time, divided by cavities | Wall thickness, part size, cavities |
| Labour and inspection | Operator and quality time, divided by parts | Inspection plan, assembly steps |
| Finishing and packing | Per-part cost of printing, texture, assembly, cartons | Specification |
| Freight | Shipping cost divided by parts per shipment | Weight, volume, destination |
How is the material cost of an injection moulded part calculated?
Material cost per part is the weight of plastic used per shot divided by the number of cavities, multiplied by the resin price. Each shot holds both the part and the runner that carries plastic to each cavity, with waste accounted for by an adjustment factor. That factor ranges from about 1.02 for a hot runner on long production runs to 1.25 for a cold runner, showing how runner choice changes material use. Overly thick runners also lengthen cycle time and increase the cost of regrind.
How is machine time calculated in injection moulding?
Machine time per part is the machine and labour hourly rate multiplied by the cycle time, divided by the number of cavities and by 3600 seconds. Each extra cavity cuts the machine time charged to every part, although it adds to the cost of the mould.
Cycle time is driven mainly by wall thickness. A typical cycle runs through mould close, injection, pack and hold, part cool, screw return, mould open and ejection, with cooling and packing taking the longest. Because wall thickness is the first step in determining manufacturability, performance and cost, a thinner, more uniform wall usually shortens the cycle.
How is tooling cost spread across an injection moulding run?
Tooling cost per part is the mould cost plus maintenance, divided by the total number of parts the mould makes. A mould that produces twice as many parts adds half as much tooling cost to each one. That fixed upfront expense is why a small run costs more per part, why unit cost drops at larger volumes, and why injection moulding tends to suit high-volume manufacture.
What other costs affect the price of an injection moulded part?
Labour, inspection, finishing, packing and freight sit on top of tooling, material and machine time. Finishing covers steps such as printing, texturing and assembly, while packing and freight depend on part size and destination. Checking that a quotation covers every stage is easier when supplies, manufacturing, packaging and other production are organised and costed together.
To map out the cost structure for your own part, list the part weight, cavity count and cycle time, apply the formulas above, spread the tooling over your planned quantity, and add finishing and freight. Then ask the moulder to confirm each input.
How does Lianto Plastics quote an injection moulded part?
Lianto Plastics reviews your drawing before quoting and returns a fixed quotation. You own the mould, and standard production runs start at around 3,000 pieces per part. Read about mould making and tooling, then send a drawing through our quote form or call 1300 214 070 for an engineering review.
Questions
What is the formula for injection moulded part cost?
In words: part cost equals tooling per part, plus material per part, plus processing per part, divided by the fraction of parts that pass. Processing per part is the machine and labour hourly rate times the cycle time, divided by the number of cavities and by 3600 seconds.
How does the number of cavities change part cost?
More cavities make more parts in each cycle, so the machine time charged to each part falls. The mould costs more to build, so the saving only pays off at higher volumes.
Why does tooling cost fall per part as volume rises?
Tooling is a fixed cost. Spread over more parts it adds less to each one, which is why MIT course notes describe cost per part as fixed cost divided by quantity, plus variable cost.
What does a moulder need to calculate my part cost?
A 3D file or drawing, the material, the expected quantity, the finish and any assembly or packing needs. Lianto reviews these in an engineering review and returns a fixed quotation.
Sources
Injection Mold Design Engineering, chapter 3: Mold Cost Estimation (sample pages), David O. Kazmer, Hanser Publishers
Lecture 17: Manufacturing system IIb, manufacturing cost (MIT 2.008), MIT OpenCourseWare
Lecture 03: Injection molding II (MIT 2.008), MIT OpenCourseWare
Injection moulding, British Plastics Federation
Part and Mold Design: Thermoplastics, A Design Guide, Covestro
Wall thickness, Envalior
Develop a new product, business.gov.au